GUANYA WATER SOLUTION has prepared a containerized high-salinity reverse-osmosis (RO) design for a mining site in Chile. The system treats high-salinity well water after upstream neutralization, flocculation and sedimentation, for industrial make-up, circulating reuse and in-plant supply. Total design feed capacity is 65 m³/h across two parallel 40 ft containers (32.5 m³/h feed per container), using single-pass seawater RO membranes with an adjustable design recovery of 45% to 55%. The work is at design and quotation stage (July 2026). The plant has not been manufactured or commissioned by GUANYA, and this note is not an operating or shipped-plant reference. The mine and client names are withheld.
This design is separate from GUANYA’s northern Chile brackish-water mining RO inquiry and from the 2.0 m³/h Chile well-water arsenic treatment design published on its own page.
Status: Design proposal and quotation | Country: Chile | Duty: Mining high-salinity well-water desalination and reuse | Design feed: 65 m³/h (two 40 ft containers, 32.5 m³/h each)
Design basis (proposal stage, not measured operation)
| Item | Design-basis value |
|---|---|
| Country / setting | Chile, mining industrial water supply (identity withheld) |
| Arrangement | Two parallel 40 ft standard containers, 32.5 m³/h feed each (65 m³/h total feed); each unit can start or stop independently |
| WAVE projection (45.0% recovery) | Feed 32.5 m³/h per container at 35,984 mg/L TDS; net permeate 14.6 m³/h per container (29.2 m³/h combined); projected permeate TDS 130.9 mg/L at 54.4 bar stage-1 feed pressure |
| Recovery design band | 45% to 55% adjustable design range, subject to confirmed feed chemistry and scaling limits |
| Two technical options | Option 1: standard high-pressure configuration without energy recovery. Option 2: lower-energy configuration with a brine energy-recovery device (ERD). |
| Pre-assembly | Factory pre-assembled and factory-tested containers; site work covers piping, power, instrumentation and upstream pretreatment tie-in |
| Status | Design and quotation — not shipped, not commissioned |
WAVE projections are design calculations, not field performance guarantees. Time to first water depends on upstream neutralization/clarification, power, civil pads and site hook-up.
What this page is not
It is not a shipped or operating mine water plant in Chile, and it does not upgrade any earlier mining inquiry or confidential engineering note to an operating reference.
Related reading
- Chile well-water arsenic treatment, 2 m³/h to NCh 409/1 — design and quotation
- Mining water treatment overview
Frequently Asked Questions
Has this 65 m³/h Chile mining RO system been shipped?
No. The status is design proposal and quotation (July 2026). It has not been manufactured or commissioned by GUANYA.
Is 65 m³/h the permeate flow or the feed flow?
65 m³/h is the total feed flow (32.5 m³/h per 40 ft container). At the 45.0% WAVE design recovery, projected net permeate is 14.6 m³/h per container (29.2 m³/h combined).
Why are there two options?
Option 1 is a standard configuration without an energy-recovery device, while Option 2 adds brine energy recovery to lower operating power. The final choice is made in project engineering.