GUANYA WATER SOLUTION has prepared a modular containerized seawater reverse-osmosis (SWRO) design for a coastal residential community in the Philippines. The total design production is 1,500 m³/day, divided into three 40 ft high-cube containers (each with a 25 m³/h train basis) that can operate independently. An optional solar photovoltaic (PV) package is quoted separately and shipped in its own container. The work is at design and quotation stage (May 2026). The plant has not been manufactured or commissioned by GUANYA, and this note is not an operating or shipped-plant reference. The community and client names are withheld.
Status: Design proposal and quotation | Country: Philippines | Duty: Coastal community drinking water | Design capacity: 1,500 m³/day across three 40 ft high-cube containers
Design basis (proposal stage, not measured operation)
| Item | Design-basis value |
|---|---|
| Country / setting | Philippines, coastal community supply (identity withheld) |
| Total design volume | 1,500 m³/day across three 40 ft high-cube containers; each container and solar section can operate independently |
| Design feed TDS | Seawater, ≤ 36,000 mg/L |
| Design recovery / rejection | 35–42% recovery; 97% design salt rejection |
| Design product TDS | ≤ 500 mg/L (calculation 200.1 mg/L), targeting WHO drinking-water guidance |
| Working pressure | 3.5–5.5 MPa; customized local voltage |
| Solar PV option | Separate PV array option (720 W panels, palletized and shipped separately) — optional addition, not a stand-alone off-grid guarantee |
| Status | Design and quotation — not shipped, not commissioned |
Each container integrates feed pumping, quartz sand filtration, 5 µm cartridge filtration, 2507 duplex high-pressure pumps, 8040 SWRO vessels, dosing and instrumentation. Time to first water depends on intake, power, PV installation (if chosen) and site hook-up.
What this page is not
It is not a shipped or operating municipal plant, and it is not a battery-backed 24-hour off-grid solar guarantee.
Related reading
- Philippines hotel SWRO, 2.5 m³/h / 50 m³/day — design and quotation
- Southeast Asia SWRO algae and biofouling control
Frequently Asked Questions
Has this 1,500 m³/day Philippines community plant been shipped?
No. The status is design and quotation (May 2026). It has not been manufactured or commissioned by GUANYA.
Can the three containers run independently?
Yes, the design splits the 1,500 m³/day capacity into three 40 ft high-cube containers so units can run independently for maintenance or staged demand.
Is the solar PV array inside the SWRO containers?
No. The quotation notes that the solar PV panels ship separately in their own container and are installed on site.