Seawater RO for a Villa in Saint Martin | 1.5 m³/h and 2 m³/h Design Options

GUANYA WATER SOLUTION has prepared two seawater reverse-osmosis (SWRO) design options for a villa in Saint Martin. One option is 1.5 m³/h, or 36 m³/day. The other is 2 m³/h, or 48 m³/day. The design feed is well seawater with a TDS of about 36,000 mg/L. The work is at design and quotation stage (RO design summaries, 12 October 2026). The unit has not been manufactured or commissioned by GUANYA, and this note is not an operating or shipped-plant reference. The villa and client names are withheld.

Status: Design proposal and quotation | Country: Saint Martin | Duty: Villa drinking water from a coastal seawater well | Design options: 1.5 m³/h (36 m³/day) or 2 m³/h (48 m³/day)

Design basis (proposal stage, not measured operation)

Item 1.5 m³/h option 2 m³/h option
Design product flow 1.50 m³/h (36 m³/day) 2 m³/h (48 m³/day)
Design feed Coastal well seawater, SDI < 5; design TDS 36,000 mg/L at 25 °C (WAVE feed about 35,984–36,070 mg/L)
Design recovery (1.5 m³/h WAVE) 31.1% (design 31.0%) Same family of well-seawater SWRO calculations; confirm against the 2 m³/h report at commissioning
WAVE permeate TDS (1.5 m³/h) 178.6 mg/L at 54.5 bar feed pressure Design calculation, not a field measurement
RO array (1.5 m³/h) Eight elements in four vessels, two elements per vessel, one pass See the matching 2 m³/h design report
Status Design and quotation — not shipped, not commissioned

Figures above are taken from DuPont WAVE design summaries dated 12 October 2026. They are design predictions, not measured operating results. A photovoltaic option appears in the quotation pack as a commercial option and is not assumed to be the base plant on this page.

What this page is not

It is not a shipped or operating villa plant, and it is not a public operating reference in the Caribbean. Time to first water depends on the well, power, tanks and hook-up.

Related reading

Frequently Asked Questions

Has this Saint Martin villa system been shipped?

No. The status is design and quotation. It has not been manufactured or commissioned by GUANYA.

Which capacity is the final plant?

Two design options were prepared: 1.5 m³/h and 2 m³/h. The option is selected in project engineering and is not treated as already built on this page.

Is the feed open-sea intake?

The design summaries take well seawater from a coastal well, with SDI < 5, not an unnamed open-coast intake as a fixed choice.

Share To:
products
products
All
Water Filter System
Containerized mine water treatment 40HQ BWRO module at a high-altitude copper mine
Containerized Mine Water Treatment Systems: BWRO & Wastewater Reuse
Containerized SWRO system for data center cooling tower makeup water
Seawater Desalination for Data Center Cooling: Containerized SWRO Systems
Containerized RO system built for a hot desert environment
Containerized Industrial RO Systems – Oil & Gas, Power Plants, Industrial Facilities
06-solar-powered-desert-water-solution-800x800
Containerized Brackish Water Desalination for Desert Camps – Solar-Ready
Containerized mining water treatment system at a high-altitude camp
Compact Brackish Water RO for Exploration and Small Mining Camps
A55
Electroplating Solution Recovery System With Low Temperature Evaporator
11_Pacific_Island_Community
Island Community Containerized Desalination System | Affordable Community RO Plant
Illustration of a containerized industrial wastewater treatment system for water reuse
Advanced Treatment Systems for Industrial, Mining and High-Strength Wastewater Applications
11
Copper Mining Wastewater Treatment & Water Reuse System for Chile
Solar containerized mining water treatment system at a mining camp
Containerized Water Supply Systems for Remote Mining Camps