GUANYA WATER SOLUTION has prepared a containerized seawater reverse-osmosis (SWRO) design for a coastal site in Argentina. The design daily production is 1,500 m³/day, made up of five parallel 40 ft units, each rated 15 m³/h (75 m³/h combined). At 20 operating hours per day, that is the 1,500 m³/day planning figure. A 24-hour theoretical output of 1,800 m³/day is stated only as operating-time flexibility, not as a standby-unit guarantee. The work is an initial technical proposal (Revision 0, September 2026), at design and quotation stage. The plant has not been manufactured or commissioned by GUANYA, and this note is not an operating or shipped-plant reference. The site and client names are withheld.
This page is a different duty from GUANYA’s 12.5 m³/h / 250 m³/day Argentina SWRO design and from the 2.00 m³/h Argentina brackish-water design, which are published as separate notes.
Status: Design proposal and quotation | Country: Argentina | Duty: Coastal seawater desalination | Design flow: 75 m³/h (1,500 m³/day at 20 h), five 40 ft units
Design basis (proposal stage, not measured operation)
| Item | Design-basis value |
|---|---|
| Country / setting | Argentina, coastal site (identity withheld) |
| Design arrangement | Five independent RO units in parallel, each in a customized 40 ft container |
| Nominal permeate capacity | 15 m³/h per unit; 75 m³/h combined; 1,500 m³/day at 20 operating hours |
| Design feed | Seawater, TDS 36,632 mg/L, 25 °C, SDI < 5 |
| Design recovery | 41.0% (WAVE projection, 28 September 2026) |
| Projected permeate TDS | 156.9 mg/L (WAVE design prediction, not an acceptance guarantee) |
| Two design options | A conventional high-pressure option, and an option with an energy-recovery device. Both share the same nominal production. Permeate quality for the energy-recovery option is not assumed to be identical without a separate aligned projection. |
| Proposed process | Seawater feed pumping, sand filtration, cartridge filtration, antiscalant dosing, high-pressure RO, ultraviolet disinfection and connection to product storage. Concentrate is routed to an agreed discharge connection. |
| Status | Initial technical proposal — design and quotation, not shipped, not commissioned |
WAVE figures are design predictions, not measured results. Factory assembly and factory testing are included in the description. Time to first water depends on intake, power, tanks and site hook-up.
What this page is not
It is not a shipped or operating plant, and the daily capacity is 1,500 m³/day, not a larger figure. Energy figures in the proposal are design estimates and are not published here as measured operating results.
Related reading
- Argentina coastal SWRO, 12.5 m³/h, 250 m³/day — design and quotation
- Argentina brackish-water RO, 2 m³/h — design and quotation
- Brazil coastal SWRO, 18 m³/h — design and quotation
Frequently Asked Questions
Has this 1,500 m³/day Argentina plant been shipped?
No. The status is an initial technical proposal and quotation. It has not been manufactured or commissioned by GUANYA.
Is the capacity 15,000 m³/day?
No. The design daily production is 1,500 m³/day at 20 operating hours, from five 15 m³/h units.
Must the energy-recovery option be selected?
No. The proposal compares a conventional option and an energy-recovery option at the same nominal production. The option is selected in project engineering.