Containerized Seawater RO for an Island Hotel in Fiji | 15 m³/h, 300 m³/day Design

GUANYA WATER SOLUTION has prepared a 40 ft high-cube, containerized seawater reverse-osmosis (SWRO) design for an island hotel in Fiji. The design product flow is 15 m³/h. At 20 operating hours per day, daily supply is about 300 m³.

This page is not a description of the Fiji island-resort SWRO units that GUANYA has already shipped. Those shipped cases remain labelled separately. The hotel name is withheld.

Country: Fiji | Duty: Island-hotel drinking water | Design flow: 15 m³/h (300 m³/day at 20 h)

The problem

An island hotel in Fiji needed a containerized seawater RO plant rated 15 m³/h, or 300 m³/day at 20 operating hours, to supply hotel drinking water. This treatment scheme is distinct from GUANYA’s already-shipped Fiji island-resort SWRO cases, which are published on separate pages.

How the scheme solves it

GUANYA prepared a 40 ft high-cube seawater RO treatment scheme. The process flow in the project description is raw-water boost → coagulant dosing and mixing → multimedia filtration → cartridge filtration → antiscalant dosing → a seawater RO train of SW400GR elements (25 elements, five pressure vessels with five elements each, one stage, 40% design recovery) → product boost, UV disinfection, remineralization and residual disinfectant. Design permeate flow is 15 m³/h. The RO train is shown with a high-pressure pump of 38 m³/h at 60 bar in the process figure. A CIP loop is included and is used only during chemical cleaning.

The general arrangement places a sand filter, dosing tanks, cartridge filter, high-pressure pump, membrane array, control cabinet, CIP tank and ventilation in the 40 ft container. The unit is factory-assembled and factory-tested; time to first water depends on intake, power, storage and site hook-up.

Design drawings

Process flow for a 15 cubic metres per hour island-hotel seawater RO scheme in Fiji, from raw-water boost and pretreatment through the RO train and product disinfection.

Process flow for the Fiji island-hotel 15 m³/h SWRO scheme (design drawing, not a photograph of a built plant).

General arrangement of a 15 cubic metres per hour containerized seawater RO unit for an island hotel in Fiji.

General arrangement of the Fiji island-hotel 15 m³/h SWRO scheme (design drawing, not a photograph of a built plant).

Design basis

Item Design-basis value
Country / setting Fiji, island hotel (identity withheld)
Design product flow 15 m³/h; about 300 m³/day at 20 operating hours
Design feed Open seawater intake, TDS 36,006 mg/L, pH 8.00, SDI < 5
Design recovery 40% (adjustable in the design between 35% and 45% at the concentrate valve)
Feed flow at 40% recovery 37.5 m³/h
RO permeate TDS (calculation) 118 mg/L, salt rejection 99.67% — calculation figures only, not field measurements
Product post-treatment (design targets) After UV, remineralization and disinfection: hardness 40–80 mg/L as CaCO₃, pH 7.5–8.0, residual chlorine 0.5–1.0 mg/L, TDS 200–400 mg/L. These are commissioning targets, to be set against the actual permeate and the hotel network.
RO array (design) 25 seawater membrane elements, five pressure vessels, five elements per vessel, one stage / one pass
Integration Process equipment, dosing, electrical control and ventilation in one 40HQ container, factory-assembled and wet-tested. On site the design connects intake, product, drain and a 415 V supply. Time to first water depends on those interfaces.

The proposed train is raw-water boost → multimedia filtration → cartridge filtration and antiscalant → high-pressure SWRO → UV, remineralization and disinfection into the hotel network. Concentrate leaves the module at the flow implied by the 40% recovery. A lawful discharge path remains the owner’s responsibility.

Related reading

Frequently Asked Questions

Is this the same as GUANYA’s already-shipped Fiji plants?

No. This page describes a treatment scheme for a 15 m³/h hotel duty. Shipped Fiji SWRO cases are published on separate pages and remain labelled as shipped, with operating results not published as measured performance.

How is the 300 m³/day figure derived?

It is 15 m³/h at 20 operating hours. Actual daily output depends on operating hours, feed quality, cleaning and downtime.

Share To:
products
products
All
Water Filter System
Containerized mine water treatment 40HQ BWRO module at a high-altitude copper mine
Containerized Mine Water Treatment Systems: BWRO & Wastewater Reuse
Containerized SWRO system for data center cooling tower makeup water
Seawater Desalination for Data Center Cooling: Containerized SWRO Systems
Containerized RO system built for a hot desert environment
Containerized Industrial RO Systems – Oil & Gas, Power Plants, Industrial Facilities
06-solar-powered-desert-water-solution-800x800
Containerized Brackish Water Desalination for Desert Camps – Solar-Ready
Containerized mining water treatment system at a high-altitude camp
Compact Brackish Water RO for Exploration and Small Mining Camps
A55
Electroplating Solution Recovery System With Low Temperature Evaporator
11_Pacific_Island_Community
Island Community Containerized Desalination System | Affordable Community RO Plant
Illustration of a containerized industrial wastewater treatment system for water reuse
Advanced Treatment Systems for Industrial, Mining and High-Strength Wastewater Applications
11
Copper Mining Wastewater Treatment & Water Reuse System for Chile
Solar containerized mining water treatment system at a mining camp
Containerized Water Supply Systems for Remote Mining Camps
1 2 3 4

Contact Us Anytime

Contact Us Anytime

Send Us a message